Fisher Body Assembly Date

Oshawa has a different format for the date than U.S. plants. It shows the shift number (1 or 2), the month number and the date in a format like 2-5-7.

Shift number is either shift 1 or shift 2, the month is numbered from 1 through 12 for January through December of a given calendar year and the date ranges from 1 through 31.